The construction of the Ted Cunningham Bridge over the Bowen River is a major infrastructure development in the Collinsville region. The new 130-meter bridge has an expected lifespan of up to 100 years. Raised by five metres compared to its predecessor, it’s designed to ensure safety in a region that’s prone to flooding.
CLIENT:
Davbridge Construction
LOCATION:
Bowen River, Queensland
SERVICE:
Surveying
INDUSTRY:
Construction
SIGNIFICANCE
The new bridge’s robust design minimises the need for frequent maintenance, reducing long-term costs. Designed to accommodate all traffic types, it demonstrates a commitment to meeting current transportation needs while anticipating and preparing for future challenges.
community impact
The Ted Cunningham Bridge is a lifeline for residents in the surrounding areas. By ensuring safe and reliable access, the bridge enhances the quality of life for these communities by providing a more stable road in and out during adverse weather.
With SEAM’s crucial involvement in construction surveying, the bridge represents a blend of technical excellence and community-focused planning. It stands as a testament to innovative infrastructure development that prioritises safety, durability and the well-being of the local communities it serves.